Built, cabled and powered for uptime.

Data Centers & Critical Facilities

Antero works inside live data centers and critical facilities across Texas — construction, structured cabling and critical power, self-performed by one crew on one contract.

Shutdown windows are the job.

Phased sequencing, temporary power and after-hours crews are standard, not an upcharge.

How a live job runs

01

Walk and plan

Existing conditions, load paths, shutdown constraints and the real budget number.

02

Method of procedure

Written MOP for every step that touches live power, approved before anyone lifts a tool.

03

Phased execution

Night and weekend crews, temporary power, one row at a time if that's what it takes.

04

Test and hand over

Certified test results, thermal scans, as-builts and a maintenance schedule.

Data Centers & Critical Facilities

Data center construction FAQ

Do you work inside live data centers?

Yes. That is most of what we do. Shutdown windows, written methods of procedure, phased sequencing, temporary power and after-hours crews are standard on our critical-facility work, not a premium service.

Do you certify the cabling you install?

Yes. Every copper run is tested and certified, and fiber is tested for loss and traced with OTDR where the job calls for it. You get the test records and as-built documentation at closeout, not a promise that it was done.

Can you take over UPS and battery maintenance?

Yes. We pick up preventive maintenance, battery replacement, capacity and load bank testing and thermal scanning on existing UPS systems, DC plants and battery strings, whoever installed them.

How far do you travel?

Statewide across Texas. We're based in Magnolia, north of Houston, and crews mobilize from there.

Tell us what you're building.

Start here

Bring us the problem, we will give you the plan.

Working out what it takes is the first thing we do.