Built, cabled and powered for uptime.
Data Centers & Critical Facilities
Antero works inside live data centers and critical facilities across Texas — construction, structured cabling and critical power, self-performed by one crew on one contract.

Shutdown windows are the job.
Phased sequencing, temporary power and after-hours crews are standard, not an upcharge.
How a live job runs
01
Walk and plan
Existing conditions, load paths, shutdown constraints and the real budget number.
02
Method of procedure
Written MOP for every step that touches live power, approved before anyone lifts a tool.
03
Phased execution
Night and weekend crews, temporary power, one row at a time if that's what it takes.
04
Test and hand over
Certified test results, thermal scans, as-builts and a maintenance schedule.
Data Centers & Critical Facilities
Data center construction FAQ
Do you work inside live data centers?
Yes. That is most of what we do. Shutdown windows, written methods of procedure, phased sequencing, temporary power and after-hours crews are standard on our critical-facility work, not a premium service.
Do you certify the cabling you install?
Yes. Every copper run is tested and certified, and fiber is tested for loss and traced with OTDR where the job calls for it. You get the test records and as-built documentation at closeout, not a promise that it was done.
Can you take over UPS and battery maintenance?
Yes. We pick up preventive maintenance, battery replacement, capacity and load bank testing and thermal scanning on existing UPS systems, DC plants and battery strings, whoever installed them.
How far do you travel?
Statewide across Texas. We're based in Magnolia, north of Houston, and crews mobilize from there.